Repair works

Over the years, we have accumulated excellent experience in carrying out internal repairs, and our previous work clearly proves this. We carry out diligent, high-quality, but at the same time quick work.

TYPES OF SERVICE

Flooring

Creating window apertures and doorways

Various types of carpentry work (woodworking)

Puttying of walls and ceilings, sanding, priming, painting, putting up wallpaper

Development of plasterboard walls, partitions and ceilings

Plumbing

Electrical installation

etc...

Our repair works experience

Vitolu iela 22/26, Liepāja

Projekta ietvaros tika izremontēts 30m2 vienistabu dzīvoklis ēkas 2. stāvā. Dzīvoklis pilnība tika pārplānots, demontētas visas starpsienas saskaņā ar projeku un veikts pilns kapitālais remonts. Ieklātas betona grīdas, atjaunoti visi stāvvadi, pārvlikta visa elektroinstalācija, siltinātas visas starpsienas un ārsienas. Nomainītas visas durvis, palodzes. Projekta realizācija no demontāžas līdz pabeiģsanai 1.5 mēn.

Darza iela 9. Liepāja

Projekta ietvaros tika izremontēts 32.7m2 vienistabu dzīvoklis ēkas 3. stāvā. Dzīvoklis pilnība tika pārplānots, demontētas visas starpsienas saskaņā ar projeku un veikts pilns kapitālais remonts. Ieklātas betona grīdas, atjaunoti visi stāvvadi, pārvlikta visa elektroinstalācija, siltinātas visas starpsienas un ārsienas. Nomainītas visas durvis, palodzes. Projekta realizācija no demontāžas līdz pabeiģsanai 1.5 mēn.

+12

Projekta ietvaros tika izremontēts 57.4m2 divu istabu dzīvoklis ēkas 2. stāvā. Dzīvokliim veikts kosmētiskais remonts. Ieklāts jauns grīdas lamināts, kājlīstes. Projekta realizācija 2 nedēļas.

+14

Vītolu iela 27/33, Liepāja

Projekta ietvaros tika izremontēts 30m2 vienistabu dzīvoklis ēkas 3. stāvā. Dzīvoklis pilnība tika pārplānots, demontētas visas starpsienas saskaņā ar projeku un veikts pilns kapitālais remonts. Ieklātas betona grīdas, atjaunoti visi stāvvadi, pārvlikta visa elektroinstalācija, siltinātas visas starpsienas un ārsienas. Nomainītas visas durvis, palodzes. Projekta realizācija no demontāžas līdz pabeiģsanai 1.5 mēn.





+12

KLAIPĒDAS IELA 58/60, LIEPĀJA

Within the project scope 52.1m2 a three-room apartment on the 5th floor of the building was fully renovated. The apartment was completely redesigned, with all partitions removed according to the project plan, and underwent a thorough capital renovation. Concrete floors were installed, all risers replaced, the entire electrical system rewired, and all partition and exterior walls insulated. All doors and windowsills were replaced. The project took 3 months from demolition to completion.

DZINTARU IELA 1, LIEPĀJA

Within the project scope 41.5m2 a four-room apartment on the 4th floor of the building was fully renovated. The apartment was completely redesigned, with all partitions removed according to the project plan, and underwent a thorough capital renovation. Concrete floors were installed, all risers replaced, the entire electrical system rewired, and all partition and exterior walls insulated. All doors and windowsills were replaced. The project took 2.5 months from demolition to completion.

+18

ULIHA IELA 35/47, LIEPĀJA

Within the project scope 40m2 a two-room apartment on the 3rd floor of the building was fully renovated. The apartment was completely redesigned, with all partitions removed according to the project plan, and underwent a thorough capital renovation. Concrete floors were installed, all risers replaced, the entire electrical system rewired, and all partition and exterior walls insulated. All doors and windowsills were replaced. The project took 2.5 months from demolition to completion.

+24

TOMA IELA 58/60, LIEPĀJA

Within the project scope 39.7m2 a two-room apartment on the 4th floor of the building was fully renovated. The apartment was completely redesigned, with all partitions removed according to the project plan, and underwent a thorough capital renovation. Concrete floors were installed, all risers replaced, the entire electrical system rewired, and all partition and exterior walls insulated. All doors and windowsills were replaced. The project took 2.5 months from demolition to completion.

+35

ELKOŅU IELA 5/9, LIEPĀJA

Within the project scope 38.3m2 a two-room apartment on the 4th floor of the building was fully renovated. The apartment was completely redesigned, with all partitions removed according to the project plan, and underwent a thorough capital renovation. Concrete floors were installed, all risers replaced, the entire electrical system rewired, and all partition and exterior walls insulated. All doors and windowsills were replaced. The project took 1.5 months from demolition to completion.

+16

KLAIPĒDAS IELA 104, LIEPĀJA

Within the project scope 47.40m2 a two-room apartment on the 7th floor of the building was fully renovated. The apartment was completely redesigned, with all partitions removed according to the project plan, and underwent a thorough capital renovation. Concrete floors were installed, all risers replaced, the entire electrical system rewired, and all partition and exterior walls insulated. All doors and windowsills were replaced. The project took 2.5 months from demolition to completion.

+18

KLAIPĒDAS IELA 78, LIEPĀJA

Within the project scope 47.40m2 a two-room apartment on the 4th floor of the building was fully renovated. The apartment was completely redesigned, with all partitions removed according to the project plan, and underwent a thorough capital renovation. Concrete floors were installed, all risers replaced, the entire electrical system rewired, and all partition and exterior walls insulated. All doors and windowsills were replaced. The project took 2.5 months from demolition to completion.

+21

TOMA IELA 47, LIEPĀJA

Within the project scope 64.5m2 a three-room apartment on the 2nd floor of the building was fully renovated. The apartment was completely redesigned, with all partitions removed according to the project plan, and underwent a thorough capital renovation. Concrete floors were installed, all risers replaced, the entire electrical system rewired, and all partition and exterior walls insulated. All doors and windowsills were replaced. The project took 3 months from demolition to completion.

+17

STACIJAS IELA 2, GROBIŅA

Within the project scope 47m2 a two-room apartment on the 2nd floor of the building was fully renovated. The apartment was completely redesigned, with all partitions removed according to the project plan, and underwent a thorough capital renovation. Concrete floors were installed, all risers replaced, the entire electrical system rewired, and all partition and exterior walls insulated. All doors and windowsills were replaced. The project took 2 months from demolition to completion.

+11

BĀRIŅU IELA 29A, LIEPĀJA

Within the project scope 88.6m2 a four-room apartment on the 3rd floor of the building was fully renovated. The apartment was completely redesigned, with all partitions removed according to the project plan, and underwent a thorough capital renovation. Concrete floors were installed, all risers replaced, the entire electrical system rewired, and all partition and exterior walls insulated. All doors and windowsills were replaced. The project took 3 months from demolition to completion.

+15

BĀRIŅU IELA 29A, LIEPĀJA

Within the project scope 85.83m2 a four-room apartment on the 2nd floor of the building was fully renovated. The apartment was completely redesigned, with all partitions removed according to the project plan, and underwent a thorough capital renovation. Concrete floors were installed, all risers replaced, the entire electrical system rewired, and all partition and exterior walls insulated. All doors and windowsills were replaced. The project took 3 months from demolition to completion.

+15

FILL OUT THE FORM OR CALL US AT +371 27888678

CONTACTS

Miks Jaunzems

miks@pilat.lv

+371 26615313

Miks Jaunzems

Chairman of the board

miks@pilat.lv

+371 26615313

SUBSCRIBE TO NEWS

copyright © 2025 Pilat.lv. All Rights Reserved. | Created by: Shortype

UZSĀK TĒRZĒŠANU